Back in the water!

The outside of the boat is DONE – sanded, primered, caulked, refinished, painted.  The mast is back on with a fresh coat of paint, too.

We are ready to put ‘er back in the water.

Launching has to be timed perfectly.  There are 4 important factors to consider:

  1. Schedule at Rick’s work
  2. Schedule at the Napa marina
  3. Schedule of the tides
  4. Schedule of the wife, me

Rick needed to plan the boat launch so that he could move WITH the tide, not against it—primarily because the outboard motor is wimpy with a capital W.  No sense in making the trip harder, right?

The Marina’s launch truck had to be available, Rick had to plan his work schedule about 2 weeks ahead so he could be off work AND I needed to drive him up there and then pick him up after docking at the Fortman Marina on Alameda Island.

Putting the boat back in the water is a simple process.  The specialized trailer slips between the dry dock supports.

The trailer slips right into place.

The trailer slips right into place.

IMG_0023_3675

The rig.   Oooh, look at our paint job!

Then the trailer’s supports lift the boat from the spindly ground supports.  The package then maneuvers around and backs onto and down the ramp.

Backing down...

Backing down…

Slowly being lowered into the water...

Slowly being lowered into the water…

She's floating!

She’s floating!

...empty slip...

…empty slip…

We get the boat gassed up at the Napa marina’s floating gas station and I wave to him as he motors down the river.  Bye, Rick!  See you in Alameda.  😉

Advertisements